SOUTHERN TRANSPORT DEVELOPEMENT PROJECT (STDP)
This is the longest Expressway out of the proposed Expressway Network. This is run from Kottawa to Matara(126 km) and also include Galle fort access road(4.9 km) .
Asian Development Bank (ADB) and Japan Bank International Cooperation (JBIC) are the main funding agencies for this project.
Kottawa to Matara (126km) & Galle fort access road (4.9 km) ADB Funded Section
Project Organization
The Employer
Road Development Authority(RDA) of Srilanka
මාර්ග සංවර්ධනය අධිකාරය
මාර්ග සංවර්ධනය අධිකාරය
|
Project Design Stage
Wilbur Smith Associates, Inc. Inassociation with
Resources Development Consultants (Pvt) Ltd.(RDC)
Pacific Consultants International.
BECA International Consultants Ltd,
Construction Stage
The Engineer
Engineering Consultanst Ltd (ECL), Sri lanka
______________________________________________________________________________________
General Contractor (Main Contractor)
Kumagai Gumi Co.,Ltd (KG)
Sub Contractors
Sub Contractor 4th Main Varieties
- Structural Work
- Earth Work
- Paving
- Any Outer
Structural Work
- Access (Metal Structure)
- ICC (Bridges)
- Maga (Bridges)
Shan Mizutani (Earth Work)
paving Work
WKK Lanka
Any Outer Works
Slope Protection Work
- Aco Protect (Cut Slope)
- ELS (Soil Nailing)
- SMS (Cut Slope Hydroseeding)
- Soil Tech(Cut Slope)
Missaka
Kithimina
U.R Construction
New Botanika
Minor Structure
- Thilak Construction
- TSK Construction
- Issura Construction
- DMR Construction
- Saneth
- Sauni Construction
- Sooraarachchi Construction
- Pamiti Construction
- Gunasekara
- JB Enterprises
- Finite Lanka
- NS
- Southern Lanka
- Kithemina
Dranages (RCB , RCBC , MSP Outher Dranages)Thilak Construction
- TSK Construction
- Issura Construction
- DMR Construction
- Saneth
- Sooraarachchi Construction
- Gunasekara
- JB Enterprises
- Southern Lanka
Asset International
Lighting
Access Int
----------------------------------------------------------------------------